RAILWAY TERMS
- 4BOJ: The undercarriage of the locomotive or wagon that carries the wheel axles.
- KURP: The measure (bend) of the parts that are built curvilinearly, mostly in the parts that turn on the railways, expressed by the diameter.
- DERAY: Derailment of railway vehicles.
- KARAMBOL: Collision of railway vehicles with each other.
- DEVER: The difference in height given to the outer rail compared to the inner rail on the curves on the road.
- SÜREKARTMAN: Too much clearance given to the road on the curves.
- ALİYMAN: straight road.
- EKARTMAN: Spacing between two rails (Normal line: 1435 mm).
- HATTI CARİ: Main road.
- İLTİSAK HATTI: Access road from the main road.
- HORTUVAR: Bumper at the end of the blind road.
- KATANER: An overhead power line on the road.
- İTİNERER: All the information you need to know about the operation of a train.
- CTC: Central traffic control of the signal system.
- FÖYDÖMARŞ: The document in which all information during the operation of the train is written.
- CONTA: The gap left between two rails at the point where two rails connect.
- RİSTURN: Pay back.
- SEJUR ÜCRETİ: The fee for the foreign wagon to stay in the country.
- TRİYAJ: Stations or stations where freight trains are prepared and delivered.
- GABARİ: The space left on both sides of the railway and above it so that railway vehicles can pass freely.
- NETTON: Ton loaded into a wagon in proportion to its capacity.
- HAMTON: The tare of a wagon or the sum of the tare and net load ( TARE + NETTON ).
- ROTASYON: The time elapsed between two fillings of a wagon.
- ÜTİLİZASYON: Making maximum use of freight and passenger wagons.